Prepare the Tests

STEP 3
Manage protocol files

STEP 5
Setup automation ED1



STEP 4 - Setup automation

·     When set to “MANUAL” the test procedures will prompt the user to execute the necessary actions manually.
·     Alternatively click “…” and activate “Use automatic switching”, then select the desired output/s of ProbitLab2.


·     Tip: Refer to the wiring diagram for using automated control of “DUT power supply”.
·     Tip: Use “All outputs/lamps connect” and “All outputs/lamps short circuit” for automated testing of LAMP FAILURE detection. Also refer to the wiring diagram.
·     Tip: Refer to the wiring diagram for using automated control of “DALI bus short circuit”.


STEP 3
Manage protocol files

STEP 5
Setup automation ED1